Friday, February 22, 2013

The List: To Do

{If you’re stopping by from Weddingbee, HOLA!. Feel free to have a look around, I'm weaning the blog off the wedding and more into everything else, so bear with me. I hope you'll stick around for a while :) }

So I showed you the house but I haven't told you what I plan to do with it yet. Below is a our preliminary (I'm sure I'll think of more things to add as time passes) rundown of the things that we'd like to do to the different rooms in the house. Enjoy.



First Floor


Foyer
  • Paint the room
  • Paint front door
  • Replace front door harware
  • Update light fixtures
  • Spray paint brass doorknob and hinges

Living Room



  • Paint the room
  • Hang curtains
  • Add bookshelves, room length desk and sofa bed.
  • Use IKEA PAX doors to close off room
  • Add hardwood floors to match rest of first floor

Dining Room



  • Paint the room
  • Hang curtains
  • Buy Dining room furniture
  • Replace light fixture
  • Add Board and Batten to bottom half of room
  • Add hardwood floors to match rest of first floor

Half-Bath



  • Paint the room with a vertical stripes pattern
  • Replace light fixture
  • Replace faucet

Staircase



  • Paint the staircase
  • Hang LONG curtains
  • Build gallery wall of pictures
  • Replace light fixture
  • Stain/paint stair rail and balusters

Family Room


  • Paint the room
  • Replace curtains
  • Add furniture
  • Add Television
  • Replace light fixture
  • Replace deck door hardware
  • Add hardwood floors to match rest of first floor

Breakfast Nook


  • Paint the room
  • Replace curtains
  • Add dinette set
  • Replace light fixture
  • Spray paint door hardware and hinges

Kitchen



  • Paint the room
  • Replace cabinet door hardware
  • Replace sink faucet
  • Replace: Refrigerator, Dishwasher, Range and hood.
  • Paint/Stain Cabinets 
  • Add glass backsplash
  • Add granite countertops


Second Floor

Hall Bathroom



  • Paint the Room
  • Spray paint doorknob and hinges
  • Frame mirror
  • Change cabinet door hardware
  • Replace light fixture
  • Replace faucets
  • Remove vinyl flooring; Put in tile
  • Paint/Stain cabinet
  • Replace countertop with solid stone

Guest bedroom



  • Paint the Room
  • Spray paint doorknob and hinges
  • Replace blue carpet with a neutral
  • Hang curtains
  • Add furniture

Nursery



  • Paint the Room
  • Spray paint doorknob and hinges
  • Hang curtains
  • Add furniture

Master Bedroom


Sorry for the mess. We were so excited after closing that we decided to buy an inflatable mattress and stay the night.

  • Paint the Room
  • Spray paint doorknob and hinges
  • Hang curtains
  • Add furniture
  • Replace light fixture


Master Bath





  • Paint the Room
  • Spray paint doorknob and hinges
  • Replace curtains
  • Frame mirror
  • Replace light fixture
  • Replace bathroom accessories
  • Replace shower, tub and vanity faucets
  • Change cabinet door hardware
  • Remove vinyl flooring; Put in tile on floor, around tub and in shower
  • Expand shower and add frameless glass walls. 
  • Paint/Stain cabinet
  • Replace countertop with solid stone

No comments:

Post a Comment